Business Wire

NuScale Power Places First Long Lead Material Production Order with Doosan Enerbility

9.3.2023 22:15:00 CET | Business Wire | Press Release

Share

NuScale Power Corporation (NYSE: SMR), the industry-leading provider of proprietary and innovative advanced nuclear small modular reactor (SMR) technology, today announced that at the end of 2022, as scheduled, it placed the first upper reactor pressure vessel (RPV) long lead material (LLM) production order with Doosan Enerbility (Doosan), a world-class manufacturing and engineering company. The order is for materials essential to commence manufacturing of the first NuScale Power Modules that are scheduled to be in commercial operation at the Utah Associated Municipal Power Systems’ Carbon Free Power Project as early as 2029. In addition, NuScale and Doosan are aligned to manufacture additional modules for future NuScale VOYGR™ SMR power plant projects with similar delivery dates.

This press release features multimedia. View the full release here: https://www.businesswire.com/news/home/20230309005685/en/

“Finalizing and submitting this order to our valued partner, Doosan, showcases NuScale’s transition to the manufacturing phase of our modules and highlights our advanced position in the market to deploy our SMR technology to customers by the end of the decade,” said John Hopkins, President and Chief Executive Officer of NuScale. “Our strong relationships with experienced partners like Doosan demonstrate NuScale’s robust global supply chain and positions us to meet the growing interest for NuScale VOYGR power plants that we are seeing around the world.”

“The U.S. Nuclear Regulatory Commission (NRC) recently issued a final rule to certify NuScale's innovative SMR design, which gives testament to NuScale’s status as the leading technology in the global SMR market,” said Jongdoo Kim, Head of Doosan Enerbility’s Nuclear Business Group. “Doosan is proud to take part in the construction of a NuScale SMR, offering clean and carbon-free energy projects to tackle climate change.”

In preparation for the long lead order, NuScale and Doosan initiated an effort in April 2022 to complete the manufacturing for the forging dies for the upper RPV. Building on this completion, the new LLM order includes heavy forgings, steam generator tubes, and weld material for six upper RPVs. The total estimated weight of the materials for six upper RPVs is more than 2,000 tons.

In addition to Doosan, NuScale continues to strengthen its supply chain readiness through coordination with its robust list of world-class suppliers and manufacturers in the U.S. and abroad.

About NuScale Power

NuScale Power Corporation (NYSE: SMR) is the industry-leading provider of proprietary and innovative advanced small modular reactor nuclear technology, with a mission to help power the global energy transition by delivering safe, scalable, and reliable carbon-free energy. The company’s groundbreaking VOYGR™ SMR plants are powered by the NuScale Power Module™, a small, safe, pressurized water reactor that can each generate 77 megawatts of electricity (MWe) or 250 megawatts thermal (gross), and can be scaled to meet customer needs through an array of flexible configurations up to 924 MWe (12 modules) of output.

As the first and only SMR to have its design certified by the U.S. Nuclear Regulatory Commission, NuScale is well-positioned to serve diverse customers across the world by supplying nuclear energy for electrical generation, district heating, desalination, commercial-scale hydrogen production, and other process heat applications.

Founded in 2007, NuScale is headquartered in Portland, Ore. To learn more, visit NuScale Power’s website or follow us on Twitter, Facebook, LinkedIn, Instagramand YouTube.

About Doosan Enerbility

Doosan is a leading Engineering, Procurement and Construction (EPC) contractor offering a wide range of services ranging from the manufacturing of castings and forgings, power generation systems and desalination facilities to the construction of power plants.

Doosan maintains a high quality standard based on extensive experience in manufacturing major components of nuclear power plants. Doosan has an integrated manufacturing facility in Changwon, Korea, which is capable of raw material production to final assembly of nuclear components. Doosan has manufactured and supplied 34 Reactor Vessels & 124 Steam Generators globally.

Forward Looking Statements

This release may contain “forward-looking statements” within the meaning of the “safe harbor” provisions of the United States Private Securities Litigation Reform Act of 1995. Forward-looking statements may be identified by the use of words such as “estimate,” “plan,” “project,” “forecast,” “intend,” “will,” “expect,” “anticipate,” “believe,” “seek,” “target” or other similar expressions that predict or indicate future events or trends or that are not statements of historical facts. These forward-looking statements are inherently subject to risks, uncertainties and assumptions. Actual results may differ materially as a result of a number of factors. Caution must be exercised in relying on these and other forward-looking statements. Due to known and unknown risks, NuScale’s results may differ materially from its expectations and projections. NuScale specifically disclaims any obligation to update these forward-looking statements. These forward-looking statements should not be relied upon as representing NuScale’s assessments as of any date subsequent to the date of this release. Accordingly, undue reliance should not be placed upon the forward-looking statements.

To view this piece of content from cts.businesswire.com, please give your consent at the top of this page.

Contact information

Media Contact
Diane Hughes, Vice President, Marketing & Communications, NuScale Power
dhughes@nuscalepower.com
(503) 270-9329

Investor Contact
Scott Kozak, Director, Investor Relations, NuScale Power
skozak@nuscalepower.com
(541) 452-7583

Doosan Media Contact
Jiho Jang, Nuclear Sales & Marketing Team 2
jiho.jang@doosan.com

About Business Wire

Business Wire
Business Wire
24 Martin Lane
EC4R 0DR London

+44 20 7626 1982http://www.businesswire.com

Subscribe to releases from Business Wire

Subscribe to all the latest releases from Business Wire by registering your e-mail address below. You can unsubscribe at any time.

Latest releases from Business Wire

Enry’s Island Unveils “Enry’s Island Adventures”: Venture Capital Becomes a Videogame and Launches the “Strap” Movement on Kickstarter3.4.2026 09:47:00 CEST | Press Release

Enry’s Island SpA (WBAG: EIOS), the world’s first publicly traded Venture Builder, today announced the upcoming Kickstarter launch of Enry’s Island Adventures (EIA), developed by its New York-based portfolio company, Enry’s Island Adventures LLC. This press release features multimedia. View the full release here: https://www.businesswire.com/news/home/20260402548535/en/ The game is designed to make venture capital accessible to new generations, transforming startup creation into an engaging and social gaming experience. After three years of R&D, EIA introduces a "bleisure" model (business + leisure): players learn to launch and manage startups through gameplay that includes real business KPIs, a customizable and evolving personal island, synchronous and asynchronous multiplayer modes, social events, and community-driven seasonal missions. The “VC revolution”: teaching and democratizing through play "I agree with Elon Musk that the best way to teach is through a video game, and this is

SES Announces Results of the Annual General Meeting2.4.2026 16:49:00 CEST | Press Release

SES (the “Company”) held the Annual General Meeting (“AGM”) of Shareholders today in Betzdorf, Luxembourg. Following the recommendations made by the Board of Directors of SES, the shareholders have voted in favor of all resolutions, including the Company’s 2025 annual accounts and the proposed annual dividend of EUR 0.50 per A-share (EUR 0.20 per B-share). The total dividend amount comprises the interim dividend of EUR 0.25 per A-share (EUR 0.10 per B-share), which has already been paid to shareholders on October 16, 2025. The final dividend of EUR 0.25 per A-share (EUR 0.10 per B-share) will be paid to shareholders on April 16, 2026. “I would like to sincerely thank our shareholders for their active engagement, visionary support and continued confidence in SES’ strategy,” said Adel Al-Saleh, CEO of SES. “The outcomes of today’s AGM underscore our shared commitment to a bold multi-orbit approach, with Medium Earth Orbit as the strategic backbone of a dynamically evolving global interco

Forrester: Three Years Into GenAI, Enterprises Are Still Chasing Its True Transformative Value2.4.2026 16:00:00 CEST | Press Release

According to Forrester’s (Nasdaq: FORR) latest report, Accelerate Your AI Voyage, most enterprises are struggling to turn growing AI adoption and investment into measurable business impact. One of the key factors holding businesses back is low artificial intelligence quotient (AIQ) — Forrester’s measure of AI aptitude — with many employees lacking a clear understanding of how to use AI. Other barriers include an overemphasis on productivity-focused use cases, difficulty measuring impact, and siloed adoption within individual functions. While these challenges can leave firms frozen in doubt or indecision, the wait-and-see approach to AI adoption is no longer viable. To unlock AI’s full potential, organizations need to focus on four key areas: Define the business outcomes and success metrics for what they want AI to achieve; identify specific use cases for AI deployment aligned to those business outcomes; establish a structured runway to plan, test, and strategically time the deployment

Andersen Consulting Adds Multiplica2.4.2026 15:30:00 CEST | Press Release

Andersen Consulting enters into a Collaboration Agreement with Multiplica, a digital consulting firm that helps organizations design, build, and scale impactful digital experiences. Founded in Spain with a presence in Latin America and the U.S., Multiplica focuses on user research and discovery, customer experience research, digital strategy, data modeling and analysis, report automation and data visualization, conversion rate optimization, product design, and user experience design. The firm helps organizations accelerate digital transformation by building digital capabilities, teams, and assets that advance expertise across digital products, consulting, and talent development. Multiplica enables clients to forecast emerging trends in digital experience and transform their businesses through enhanced digital channels and customer engagement. “Collaborating with Andersen Consulting represents an exciting opportunity to extend our reach and impact,” said David Boronat, CEO of Multiplica

The LYCRA Company Announces Strategic Partnership on Renewable LYCRA ® Fiber2.4.2026 15:00:00 CEST | Press Release

The LYCRA Company, a global leader in innovative and sustainable fiber solutions for the apparel and personal care industries, today announced the signing of a strategic partnership agreement with Texhong International Group Limited (“Texhong”), one of the world’s largest suppliers of core-spun cotton textiles. Under the agreement, Texhong will exclusively partner with The LYCRA Company to bring Renewable LYCRA® fiber made with 30 percent plant-based content* to China’s core-spun yarn sector. This collaboration aims to accelerate the adoption of bio-derived spandex across the global apparel and textile industry. This press release features multimedia. View the full release here: https://www.businesswire.com/news/home/20260402505834/en/ The LYCRA Company announced a strategic partnership with Texhong International Group for renewable LYCRA® fiber. Pictured at the signing ceremony held in Shanghai (left to right): Jason Wang, Vice President, Asia, The LYCRA Company, and Zhou Xia, Chief O

In our pressroom you can read all our latest releases, find our press contacts, images, documents and other relevant information about us.

Visit our pressroom
World GlobeA line styled icon from Orion Icon Library.HiddenA line styled icon from Orion Icon Library.Eye