Flower Infrastructure Technologies MidCo AB (publ) – Divestment of 100 MW Battery Storage Project in Germany within the Tolling Group13.10.2026 10:30:11 CEST | Flower Infrastructure Technologies MidCo AB (publ) | Inside information
Flower Tolling HoldCo AB, a member of the Tolling Group (as defined in the terms and conditions (the “Terms and Conditions”) for Flower Infrastructure Technologies MidCo AB (publ)’s (“MidCo”) up to SEK 1,000,000,000 senior secured callable floating rate bonds with ISIN SE0027098492), has divested the 100 MW / 400 MWh Bergedorf battery energy storage project in Hamburg, Germany, to Flower Infrastructure Technologies German Tolling AB (publ) (“German Tolling”).